This was such a great afternoon trip! Some history information on the Dam that I found is listed below.
“On May 4, 1927 the Hermitage Dam, on the Wag Water River, was opened. It was built to provide a reserve water supply for the Corporate Area of Kingston and St. Andrew. The dam is 142 feet high, 465 feet wide, and is capable of storing 430,000,000 gallons of water. It took two and a half years to build.” – Jamaica Gleaner